Unusual Challenges:
-Demolish existing bridge and install steel sheeting and cofferdams in and around the canal without disrupting water flow.
- Build a new bridge from the footings up including a special wood facade to maintain the historic look of the area.
- Repair any disturbed areas in and around the canal.
Unique Solutions:
- Anselmi & DeCicco used value engineering, specific equipment and various materials to change and improve the construction methods of this project.
- This provides a better end product, reduces employee exposure to the dangers of workin in & around water, and minimizes disturbance to the existing area.